WELL MANAGEMENT STRATEGY THROUGH PRODUCTION MODELING: STUDY CASE WELL B-5
Metode konvensional yang sering digunakan operator lapangan minyak dan gas dalam memproduksikan sumur di reservoir batu pasir yaitu dengan menggunakan batasan tekanan drawdown untuk menghindari adanya kepasiran. Tiffin et al. (2003) menuliskan bahwa tekanan drawdown sebesar 500 psi hingga 1000 psi s...
Saved in:
Main Author: | Khoironi, Budi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69138 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ENHANCING WELL PRODUCTION IN MATURE FIELDS THROUGH MATRIX ACIDIZING METHODS
by: Syakinah Arifin, Jihan -
COMPARISON OF CASING MATERIAL SELECTION IN GAS DEEPWATER WELL, CARBON CAPTURE STORAGE WELL, AND GEOTHERMAL WELL
by: Triveda Fajri, Nugroho -
TUBING STRENGTH ANALYSIS AND FAILURE ASSESSMENT OF ELECTRICAL SUBMERSIBLE PUMP (ESP) WELL: A CASE STUDY ON PRODUCTION WELL âXâ
by: De Milano Palbeno, Anthonio -
RISK ASSESSMENT MATRIX EVALUATION AS A DECISION-MAKING TOOL IN MANAGING MATURE WELL INTEGRITY: A CASE STUDY IN LEAKED WELL
by: Ayu Alnamira, Sabrina -
PERFORMANCE EVALUATION OF ZIRCONIA SCREEN IN SHALLOW GAS WELL : A CASE STUDY IN WELL T2
by: Arganu Pradipta, Gading