DESIGN OF MINE DRAINAGE SYSTEM IN THE POST-MINING SYSTEM (CASE STUDY OF THE SOUTHWEST AREA OF THE BINUNGAN MINE OPERATION SITE 2 BLOCK 8 PT BERAU COAL, EAST KALIMANTAN)
Binungan Mine Operation (BMO) Site 2 Block 8 is one of PT Berau Coal’s mining sites which is planned to end its production operation period and will enter the post-mining period in 2025. In the current post-mining planning, one of the options for a post-mining water management scheme at Site BMO 2 B...
Saved in:
Main Author: | Raihan Aziz, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69317 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CHARACTERISTICS OF BONE COAL IN MINING AREA OF PT. BERAU COAL BINUNGAN AND SAMBARATA MINING SITE BERAU SUB-BASIN, TARAKAN BASIN, EAST KALIMANTAN
by: DIAN RIFALDI (NIM : 12113074), MIRZA -
MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN
by: Clara Chika Giri Asta P, Putu -
IMPLEMENTATION MINING EYES TECHNOLOGY FOR OPERATIONAL EFECTIVENESS BINUNGAN MINE OPERATION TWO PT BERAU COAL, EAST KALIMANTAN
by: Idris, Jimmi -
SLOPE STABILITY ANALYSIS IN COAL MINE USING LIMIT EQUILIBRIUM METHOD AND FINITE ELEMENT METHOD IN BLOCK 8 BINUNGAN MINE OPERATION 2 PT BERAU COAL, BERAU DISTRICT, EAST KALIMANTAN
by: Farel Putrafidi, Muhamad -
SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
by: Wulandari, Diah