MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN
In open-pit mining, the overburden material needs to be excavated or blasted to a certain depth. The material will be transported to the disposal area according to the planned progress plan. When there is heavy rain, the disposal material will be eroded due to its characteristic as a loose material....
Saved in:
主要作者: | Clara Chika Giri Asta P, Putu |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/69380 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
DESIGN OF OUT PIT DUMP MINE DRAINAGE IN POST-MININNG SYSTEM (CASE STUDY OF OPD WEST PIT ON 2 SITE LATI MINE OPERATION PT BERAU COAL, BERAU REGENCY, EAST KALIMANTAN)
由: Fikri Lazuardi, Muhammad -
MINE DRAINAGE FACILITY PLANNING AT WASTE DUMP COAL MINE OF PT XYZ
由: Ernasari, Meilia -
MINE DRAINAGE FACILITIES PLANNING IN PIT OF COAL MINING PT XYZ
由: Indriani Amir, Lili -
MINE DRAINAGE FACILITY PLANNING OF SEMERU WASTE DUMP AT PT XYZ COAL MINE
由: Muhammad, Zaki -
INVESTMENT ANALYSIS OF CRUSHING STATION 11 UPGRADE TO SUPPORT COAL PRODUCTION IN PIT Z, BINUNGAN MINE OPERATIONS, PT. BERAU COAL
由: Fadhlullah Muharam, Adnan