OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA

TN is a mature giant gas field in Andalan Block Contract Area which is operated by PT Surya Energy Company (PT SEC). TN wells are located in the delta of Andalan river and currently already entering production decline phase. Drilling activities in PT SEC itself has entered industrialization phase...

Full description

Saved in:
Bibliographic Details
Main Author: Ryan Aditya Surya Wijaya, Raden
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/70041
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:70041
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Ryan Aditya Surya Wijaya, Raden
OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
description TN is a mature giant gas field in Andalan Block Contract Area which is operated by PT Surya Energy Company (PT SEC). TN wells are located in the delta of Andalan river and currently already entering production decline phase. Drilling activities in PT SEC itself has entered industrialization phase since early year 2000, resulted by more than 20 years of learning curve creation in the construction of well design architecture. The wells have been drilled in the optimized ways to obtain the ultimate well drilling performance which is significant well cost reduction in order to meet well economy. Several phases have been passed through until current field development milestone. Currently most of the wells drilled are targeting marginal hydrocarbon (HC) reserve. The downturn of oil and gas industry in mid-year 2014 had pushed the Well Construction team or well-known as Drilling & Well Intervention team in PT SEC to further squeeze the well duration beyond the technical limit in order to meet the economy of wells drilled and continue drilling operation activities in order to maintain hydrocarbon production plateau. Many innovative ideas have been implemented to achieve these objectives such as the implementation of batch drilling, offline drilling activities, well architecture optimization, more rigless operation and other initiatives as alternative solutions have been introduced and will be planned to reduce well duration and operating cost in overall. This research study discusses what factors that cause the well cost become high when drilling in TN field especially in TN Shallow development, investigation of the root cause (s), and the alternative solutions that may be feasible and also the implementation of the selected alternative solutions in order to avoid the company loss opportunity to drill and produce new TN Shallow wells. The root cause analysis used the current reality tree (CRT) which identify main root cause on why the well cost become high or premium, which is high site preparation cost specifically to perform dredging activity. The site preparation is needed to allow for Swamp Barge (SB) rig and any other barge access to safely enter the well location and perform drilling activities with the fact that the conventional SB rig is considered the only means to drill new wells in TN field. The alternative solutions of the root cause were determined, and then the best alternative solutions were selected using the analytic hierarchy process (AHP). The ultimate criteria for the selection of the alternative is the overall well cost creation, how immediate means of drilling new wells as solution can provide the impact to the overall well cost reduction. Several alternative solutions are results of study and research of improvement on drilling project management implementation, including but not limited to do some efforts in reducing drilling duration and innovative means to drill new wells with fit-for-purpose design of drilling fleet, without using conventional SB rig which require huge amount of dredging volume thus resulting in high site preparation cost. Selected alternative solution to perform drilling activities using Hydraulic Workover Unit (HWU) is the best solution considering the equipments and working barges technical capacity requirement point of view which resulting less daily drilling expense than the SB rig has resulting in less overall well cost. Drilling with HWU is a complex project management involving many entities with various competencies requirement within and outside the company organization. Eventhough the result of implementation may not be measured and obtained in short period, the ultimate objective of reducing overall well cost to keep the well economy is expected to gained in the first campaign in year 2023.
format Theses
author Ryan Aditya Surya Wijaya, Raden
author_facet Ryan Aditya Surya Wijaya, Raden
author_sort Ryan Aditya Surya Wijaya, Raden
title OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
title_short OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
title_full OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
title_fullStr OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
title_full_unstemmed OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
title_sort optimizing drilling cost through the application of hydraulic workover unit to drill new wells in andalan delta
url https://digilib.itb.ac.id/gdl/view/70041
_version_ 1822006195787923456
spelling id-itb.:700412022-12-23T09:13:42ZOPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA Ryan Aditya Surya Wijaya, Raden Manajemen umum Indonesia Theses drilling activities, premium well cost, current reality tree (CRT), analytic hierarchy process (AHP), drilling project management, hydraulic workover unit (HWU) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70041 TN is a mature giant gas field in Andalan Block Contract Area which is operated by PT Surya Energy Company (PT SEC). TN wells are located in the delta of Andalan river and currently already entering production decline phase. Drilling activities in PT SEC itself has entered industrialization phase since early year 2000, resulted by more than 20 years of learning curve creation in the construction of well design architecture. The wells have been drilled in the optimized ways to obtain the ultimate well drilling performance which is significant well cost reduction in order to meet well economy. Several phases have been passed through until current field development milestone. Currently most of the wells drilled are targeting marginal hydrocarbon (HC) reserve. The downturn of oil and gas industry in mid-year 2014 had pushed the Well Construction team or well-known as Drilling & Well Intervention team in PT SEC to further squeeze the well duration beyond the technical limit in order to meet the economy of wells drilled and continue drilling operation activities in order to maintain hydrocarbon production plateau. Many innovative ideas have been implemented to achieve these objectives such as the implementation of batch drilling, offline drilling activities, well architecture optimization, more rigless operation and other initiatives as alternative solutions have been introduced and will be planned to reduce well duration and operating cost in overall. This research study discusses what factors that cause the well cost become high when drilling in TN field especially in TN Shallow development, investigation of the root cause (s), and the alternative solutions that may be feasible and also the implementation of the selected alternative solutions in order to avoid the company loss opportunity to drill and produce new TN Shallow wells. The root cause analysis used the current reality tree (CRT) which identify main root cause on why the well cost become high or premium, which is high site preparation cost specifically to perform dredging activity. The site preparation is needed to allow for Swamp Barge (SB) rig and any other barge access to safely enter the well location and perform drilling activities with the fact that the conventional SB rig is considered the only means to drill new wells in TN field. The alternative solutions of the root cause were determined, and then the best alternative solutions were selected using the analytic hierarchy process (AHP). The ultimate criteria for the selection of the alternative is the overall well cost creation, how immediate means of drilling new wells as solution can provide the impact to the overall well cost reduction. Several alternative solutions are results of study and research of improvement on drilling project management implementation, including but not limited to do some efforts in reducing drilling duration and innovative means to drill new wells with fit-for-purpose design of drilling fleet, without using conventional SB rig which require huge amount of dredging volume thus resulting in high site preparation cost. Selected alternative solution to perform drilling activities using Hydraulic Workover Unit (HWU) is the best solution considering the equipments and working barges technical capacity requirement point of view which resulting less daily drilling expense than the SB rig has resulting in less overall well cost. Drilling with HWU is a complex project management involving many entities with various competencies requirement within and outside the company organization. Eventhough the result of implementation may not be measured and obtained in short period, the ultimate objective of reducing overall well cost to keep the well economy is expected to gained in the first campaign in year 2023. text