OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
TN is a mature giant gas field in Andalan Block Contract Area which is operated by PT Surya Energy Company (PT SEC). TN wells are located in the delta of Andalan river and currently already entering production decline phase. Drilling activities in PT SEC itself has entered industrialization phase...
Saved in:
Main Author: | Ryan Aditya Surya Wijaya, Raden |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70041 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
DEVELOPMENT OF COST BOOK & DIGITAL DASHBOARD TO IMPROVE COST MONITORING IN DRILLING & COMPLETIONS
by: Wijaya, Candy -
WORKOVER AND WELL SERVICE PERFORMANCE IMPROVEMENT USING LEAN SIX SIGMA CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT AAA
by: Adi Prasetyo, Bayu -
REUSE OF DRILLING MUD IN 2021 HEAVY OIL DRILLING CAMPAIGN CASE STUDY: DRILLING OPERATION AT RIG âAâ IN THE DURI FIELD OF PT. SCM
by: Setiawan, Nurmanthias