OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA

TN is a mature giant gas field in Andalan Block Contract Area which is operated by PT Surya Energy Company (PT SEC). TN wells are located in the delta of Andalan river and currently already entering production decline phase. Drilling activities in PT SEC itself has entered industrialization phase...

Full description

Saved in:
Bibliographic Details
Main Author: Ryan Aditya Surya Wijaya, Raden
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/70041
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia