FORECASTING METHOD DEVELOPMENT FOR STANDARD MATERIAL PROVISION USED ON AIRCRAFT MAINTENANCE PACKAGE (STUDY CASE: B737NG AIRCRAFT C CHECK)
Material availability has always been a very crucial aspect in the aircraft maintenance process to ensure the continuity of the scheduled maintenance. But in practice, the materials provided are too many, which caused most of the materials ended up not being used. This practice causes many unnece...
Saved in:
Main Author: | Jethro, Vincent |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/70074 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF AIRCRAFT MAINTENANCE TASK PACKAGING FOR B737-800 NG
by: Marvella -
EVALUATION OF MAINTENANCE TASKS EFFECTIVENESS ON AIRCRAFT LANDING WHEELS B737-800
by: Yosafat Hertanto, Adrian -
A QUALITY COMPONENT OF AIRCRAFT MAINTENANCE USING MAINTENANCE PLANNING AND SCHEDULING PRINCIPLES. CASE STUDY C-CHECK BOEING 737-800
by: PRIMA GASTRIANI, OVI -
OPTIMIZATION OF AIRCRAFT SPARE PARTS PROVISION BY CONSIDERING ABSENCE COSTCASE STUDY: BRAKE PAD B737-800
by: Sasti Widianti, Amalia -
ANALYSIS OF DELAY IN COMPLETING C-CHECK (CASE STUDY: MAINTENANCE ON BOEING 737NG AT PT XYZ)
by: Martina, Ayu