DETERMINING THE OPTIMAL CAPITAL STRUCTURE OF PT BUMI RESOURCE TBK
The energy crises that occurred in Europe and China led to an increase in demand for coal. This increase in demand was also accompanied by an increase in world coal prices. The increase in demand also occurred in Indonesia as one of the countries with the largest coal reserves in the world. In addit...
Saved in:
Main Author: | Ariefrahman Dzaki, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70295 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DETERMINING OPTIMAL CAPITAL STRUCTURE (CASE STUDY : PT ELNUSA TBK)
by: Junaedi, Achmad -
DETERMINING THE OPTIMAL CAPITAL STRUCTURE OF PT MEDCO ENERGI INTERNASIONAL TBK
by: Dhianaufal -
DETERMINE THE OPTIMAL CAPITAL STRUCTURE OF PT. INDOFOOD CBP SUKSES MAKMUR TBK (PT. ICBP)
by: Alfiandi, Andro -
DETERMINING THE OPTIMAL CAPITAL STRUCTURE OF COAL COMPANY (CASE STUDY: PT. DELTA DUNIA MAKMUR TBK)
by: Ronauli Sianipar, Santi -
DETERMINING THE OPTIMAL CAPITAL STRUCTURE OF PT. XYZ TBK. FOR SUPPORTING GROWTH AND MAXIMIZING THE VALUE OF FIRM AND SHAREHOLDERS
by: Fakhri, Rafid