INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT

The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven...

Full description

Saved in:
Bibliographic Details
Main Author: Irwan, Maurys
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/70753
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:70753
spelling id-itb.:707532023-01-20T09:46:22Z INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT Irwan, Maurys Manajemen umum Indonesia Theses investment project analysis, discounted cash flow, probabilistic analytic, monte carlo INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70753 The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven coal prices to historical highs. The management of PT Berau Coal considered accelerating the commencement of mining and asked the mine planner to carry out an Investment Project Analysis for the Binungan B 10 Mining Project. To determine the economic valuation of investment projects, currently PT. Berau Coal uses a deterministic static model, whereas the Discounted Cash Flow model is based on the assumption that the variables used in the calculation are static. This final project examines 3 different mine plan options based on production schedule and duration, using the DCF approach. According to the calculation results, the highest NPV is generated by the base option, and the second alternative is the middle option, with a slightly lower NPV but better IRR and Payback Period. Assuming a coal price index of $30/t, the base option gives an NPV of $311.68 million, and the intermediate option, offers an NPV of $311.17 million. Considering the results, mine planning performs a probabilistic analysis using Monte Carlo simulation. In the probabilistic method, 3 uncertainty variables (coal price, production rate, and mining costs) are simulated simultaneously through Monte Carlo Simulation for both production schedule options. The results show that the basic option still has a higher average NPV than the middle option. The average NPV for a basic option is $175 Million, and an intermediate option is $171 Million. Based on various analyzes that have been carried out, it is concluded that the investment in the Binungan B 10 project is feasible to follow up using the basic option, with a positive NPV probability (> 0) above 78%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Irwan, Maurys
INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
description The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven coal prices to historical highs. The management of PT Berau Coal considered accelerating the commencement of mining and asked the mine planner to carry out an Investment Project Analysis for the Binungan B 10 Mining Project. To determine the economic valuation of investment projects, currently PT. Berau Coal uses a deterministic static model, whereas the Discounted Cash Flow model is based on the assumption that the variables used in the calculation are static. This final project examines 3 different mine plan options based on production schedule and duration, using the DCF approach. According to the calculation results, the highest NPV is generated by the base option, and the second alternative is the middle option, with a slightly lower NPV but better IRR and Payback Period. Assuming a coal price index of $30/t, the base option gives an NPV of $311.68 million, and the intermediate option, offers an NPV of $311.17 million. Considering the results, mine planning performs a probabilistic analysis using Monte Carlo simulation. In the probabilistic method, 3 uncertainty variables (coal price, production rate, and mining costs) are simulated simultaneously through Monte Carlo Simulation for both production schedule options. The results show that the basic option still has a higher average NPV than the middle option. The average NPV for a basic option is $175 Million, and an intermediate option is $171 Million. Based on various analyzes that have been carried out, it is concluded that the investment in the Binungan B 10 project is feasible to follow up using the basic option, with a positive NPV probability (> 0) above 78%.
format Theses
author Irwan, Maurys
author_facet Irwan, Maurys
author_sort Irwan, Maurys
title INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
title_short INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
title_full INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
title_fullStr INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
title_full_unstemmed INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
title_sort investment project analysis the case of binungan block 10 mine project
url https://digilib.itb.ac.id/gdl/view/70753
_version_ 1822991727414214656