INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/70753 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |