INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT

The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven...

全面介紹

Saved in:
書目詳細資料
主要作者: Irwan, Maurys
格式: Theses
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/70753
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia