INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
The Binungan Block 10 Mining Project is marginal from the previous economic valuation. Higher operational costs, land issues and low coal quality have become management's considerations for delaying operations. However, the demand for coal has increased significantly recently, which has driven...
Saved in:
Main Author: | Irwan, Maurys |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70753 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
by: Hudiantoro, Arief -
INVESTMENT PROJECT ANALYSIS OF PT. BERAU COAL BLOCK 5-6 BINUNGAN USING DISCOUNTED CASH FLOW METHOD
by: Ilham Mury Nanda, Ridho -
INVESTMENT VALUATION OF LONG-TERM COAL MINING PROJECT AT PIT J BINUNGAN 8 (CASE STUDY PT BC)
by: Indra Subroto, Andhika -
INVESTMENT PROJECT ANALYSIS OF PT BERAU COAL BLOCK A, BLOCK B AND BLOCK C COAL MINING PROJECT USING DISCOUNTED CASH FLOW METHOD
by: Wayan Supriharta, Ida -
INVESTMENT PROJECT ANALYSIS OF PTBC BLOCK 9 COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Prio Prakoso, Anjas