CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
Indonesia's total crude oil production in the first semester of 2022 of 616,82 MBOPD. The average production of the Kalimantan area in the first semester of 2022 was 42.319 BOPD, about 0,04% of the total crude oil production of the Indonesian exploration oil and gas company. The process of l...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/82039 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |