CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)

Indonesia's total crude oil production in the first semester of 2022 of 616,82 MBOPD. The average production of the Kalimantan area in the first semester of 2022 was 42.319 BOPD, about 0,04% of the total crude oil production of the Indonesian exploration oil and gas company. The process of l...

Full description

Saved in:
Bibliographic Details
Main Author: Vidya Prestiwi, Yona
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/82039
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:82039
spelling id-itb.:820392024-07-05T13:28:15ZCAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX) Vidya Prestiwi, Yona Manajemen umum Indonesia Theses Investment analysis, Well Head Control Panel, Monte Carlo Method INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82039 Indonesia's total crude oil production in the first semester of 2022 of 616,82 MBOPD. The average production of the Kalimantan area in the first semester of 2022 was 42.319 BOPD, about 0,04% of the total crude oil production of the Indonesian exploration oil and gas company. The process of lifting oil and gas in the production process generally uses a pneumatic hydroulic system controlled by the wellhead control panel. Well head control panel (WHCP) is a well control centre that functions as a system to control oil and gas production (lifting). Exploration oil and gas company, uses the services of a second party as a company that provides a well head control panel system in the project. PT XXX is an electrical contracting company that won a tender to provide a well head control panel system for the exploration oil and gas company. The financial investment analysis is used to ensure that the well head control panel project at the exploration oil and gas company is feasible by considering the NPV and IRR values. But first, due to limited information, PT XXX must make a well drilling sequence projection from the well drilling sequence data for 12 months with a total of 93 wells provided by the exploration oil and gas company, using the Monte Carlo method to obtain a well drilling sequence projection (well work plan) on this project. The result is that it takes 28 months to drill 216 wells. The value of this well head control panel project is USD 4 millions, PT XXX invested funds in operational expenditure (OPEX) are worth USD 3.670.630 with a WACC of 7,28%. The NPV is estimated at USD 247.880, profitability index 2,87 with an IRR value of 48,05%, and payback period are 27 months, 11 days. Some components of this calculation are still based on assumptions. In general, the project as actually implemented will remain dynamic. This is because there are several conditions that may change, especially in relation to technical matters and company procedures. Nevertheless, this investment analysis can be used as a recommendation for determining the basic costs to avoid overrunning or underrunning costs in the budgeting process. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Vidya Prestiwi, Yona
CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
description Indonesia's total crude oil production in the first semester of 2022 of 616,82 MBOPD. The average production of the Kalimantan area in the first semester of 2022 was 42.319 BOPD, about 0,04% of the total crude oil production of the Indonesian exploration oil and gas company. The process of lifting oil and gas in the production process generally uses a pneumatic hydroulic system controlled by the wellhead control panel. Well head control panel (WHCP) is a well control centre that functions as a system to control oil and gas production (lifting). Exploration oil and gas company, uses the services of a second party as a company that provides a well head control panel system in the project. PT XXX is an electrical contracting company that won a tender to provide a well head control panel system for the exploration oil and gas company. The financial investment analysis is used to ensure that the well head control panel project at the exploration oil and gas company is feasible by considering the NPV and IRR values. But first, due to limited information, PT XXX must make a well drilling sequence projection from the well drilling sequence data for 12 months with a total of 93 wells provided by the exploration oil and gas company, using the Monte Carlo method to obtain a well drilling sequence projection (well work plan) on this project. The result is that it takes 28 months to drill 216 wells. The value of this well head control panel project is USD 4 millions, PT XXX invested funds in operational expenditure (OPEX) are worth USD 3.670.630 with a WACC of 7,28%. The NPV is estimated at USD 247.880, profitability index 2,87 with an IRR value of 48,05%, and payback period are 27 months, 11 days. Some components of this calculation are still based on assumptions. In general, the project as actually implemented will remain dynamic. This is because there are several conditions that may change, especially in relation to technical matters and company procedures. Nevertheless, this investment analysis can be used as a recommendation for determining the basic costs to avoid overrunning or underrunning costs in the budgeting process.
format Theses
author Vidya Prestiwi, Yona
author_facet Vidya Prestiwi, Yona
author_sort Vidya Prestiwi, Yona
title CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
title_short CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
title_full CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
title_fullStr CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
title_full_unstemmed CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
title_sort capital investment analysis of well head control panel project in kalimantan (cases study at pt xxx)
url https://digilib.itb.ac.id/gdl/view/82039
_version_ 1822997532764012544