CAPITAL INVESTMENT ANALYSIS OF WELL HEAD CONTROL PANEL PROJECT IN KALIMANTAN (CASES STUDY AT PT XXX)
Indonesia's total crude oil production in the first semester of 2022 of 616,82 MBOPD. The average production of the Kalimantan area in the first semester of 2022 was 42.319 BOPD, about 0,04% of the total crude oil production of the Indonesian exploration oil and gas company. The process of l...
Saved in:
Main Author: | Vidya Prestiwi, Yona |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/82039 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CAPITAL INVESTMENT ANALYSIS OF COAL WASHING PLANT IN PT. XYZ, SOUTH KALIMANTAN
by: Warman, Okky -
IMPROVEMENT OF PROCUREMENT POLICY AND INVENTORY SYSTEM MANAGEMENT IN MSD OF PT XXX
by: Maryani -
CAPITAL INVESTMENT ANALYSIS OF SLURRY PUMP IN PIT QSV1, EAST KALIMANTAN (CASE STUDY AT PT BERAU COAL)
by: Riaviandhi, Dhehave -
DETERMINING OPTIMAL CAPITAL STRUCTURE FOR PT PUPUK KALIMANTAN TIMUR
by: Dzikyan Fauzia, Devy -
FINAL INVESTMENT DECISION (FID) PROCESS IMPROVEMENT IN OIL & GAS MAJOR CAPITAL PROJECT CASE STUDY OF PT. VULâS DECISION-MAKING PROCESS
by: Wibisono, Marco