INVESTMENT EVALUATION OF CO2 REMOVAL PLANT CASE STUDY AT BAMBU BESAR STRUCTURE
The Bambu Besar (BBS) is part of the Subang field and has 14 wells with a production of 4500 bpd and 20 MMscfd. Not all of the gas production is for sale; 5 MMscfd of gas is flaring because it has a CO2 content of 48%. The company is enthusiastic about monetizing this gas because it still has econom...
Saved in:
Main Author: | Yusuf Indra Surya, Mochammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70985 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE EVALUATION OF CO 2 REMOVAL CONTRACT (A CASE STDY OF RANDEGAN AREA)
by: Wahyu Alimsyah, Tomi -
MONITORING AND EVALUATION OF TRANS SUMATRA TOLL ROAD INVESTMENT BAKAUHEUNI â TERBANGGI BESAR SECTION
by: Leonard, Jimmy -
INVESTMENT EVALUATION OF FLUE GAS DESULFURIZATION FOR COAL-FIRED POWER PLANT (CASE STUDY AT PT ABC POWER)
by: Marten, Yori -
UPGRADING THE FACILITIES AVAILABLE AT DUSUN BAMBU
by: Rizkia Rachmah, Dina -
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
by: Siregar, Abdollah