DECISION MAKING TO DETERMINE THE MOST OPTIMUM LOCATION FOR GAS WELLHEAD COMPRESSOR INSTALLATION PROJECT IN A-GAS FIELD
PT Ardico Pratama Energi (PT APE) is one of oil and gas service company provider in Indonesia. In early 2022, PT APE was awarded to provide the installation, service, and operation of a gas wellhead compressor facility in the A-Gas field under the rental basis scheme. Operated under one of the Kontr...
Saved in:
Main Author: | Perbawa Riksa, Angga |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72025 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GAS PIPELINE DESIGN FOR DINAMIC OPTIMIZATION Case Study of Determining Optimum Compressors Placement
by: DJOKO DWI UTOMO (NIM : 22208307); Pembimbing : Dr. Ir. Arsegianto, M.Sc., RINALDI -
ANALYSIS OF COMPRESSOR REQUIREMENT AND PIPE SIZE SELECTION IN GAS COMPRESSOR STATION CASE STUDY: GAS COMPRESSOR STATION IN MERBAU
by: RAHIM BIMA DWI PUTRA (NIM : 13104138); Dosen Pembimbing I : Prof. Dr. Ir. IGN Wiratmaja Puja ; , NUR -
Piping System Stress Analysis on Gas Compressor Station (Case Study: Gas Compressor Station at Pondok Tengah)
by: BANI PERWIRA (NIM 13104160), YOSEPHUS -
DESIGN INSTALLATION OF VELOCITY STRING FOR GAS WELLS IN NB OFFSHORE FIELD
by: (NIM : 22214017), DJABARUDDIN -
OPTIMIZATION OF COMPRESSOR SPECIFICATIONS IN GAS LIFT SYSTEM
by: PERMANA, ANDRI