DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
The activity of moving excavated material from one place to another provides the cost of loading and transporting material that must be borne by the mining company. The cost of loading and transporting can be kept to a minimum by optimizing the number of transportation equipment used and options of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72075 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |