DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE

The activity of moving excavated material from one place to another provides the cost of loading and transporting material that must be borne by the mining company. The cost of loading and transporting can be kept to a minimum by optimizing the number of transportation equipment used and options of...

Full description

Saved in:
Bibliographic Details
Main Author: Darmawan, Michael
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72075
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:72075
spelling id-itb.:720752023-03-03T11:11:02ZDUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE Darmawan, Michael Indonesia Final Project Optimization, Loading and Hauling Costs, Intermediate Stockpile, Front INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72075 The activity of moving excavated material from one place to another provides the cost of loading and transporting material that must be borne by the mining company. The cost of loading and transporting can be kept to a minimum by optimizing the number of transportation equipment used and options of the hauling process. PT XYZ is an andesite mine whose products will be used to build a dam. However, the route that must be taken by hauling equipment is quite far, namely 53,225 kilometers from mining front, so we need to find other alternatives to minimize the hauling costs. In this research, the optimization of hauling process will be carried out with the intermediate stockpile on the hauling road and mining equipment changes. The method used in this research is optimization using the Simplex LP Linear Program. In this case, we used the data from the Liebherr R9250, Komatsu PC2000-8, Komatsu WA900-3 loading equipment and the Komatsu HD785 and DPRT Scania R580 Cap. 330 m3 hauling equipment to process the data. There are two scenarios of hauling process and different mining equipment were used, with the aim of producing the lowest loading and transportation costs while still paying attention to achieve the ideal match factor value. In scenario 1, the combination of loading and hauling equipment in the form of 4 units backhoe Komatsu PC2000-8 and 120 units DPRT Scania R580 Cap. 330 m3 compared with 4 units backhoe Liebherr R9250 and 220 units dump truck Komatsu HD785. In scenario 2, the combination of loading and hauling equipment changed in the form of 2 units backhoe Komatsu PC2000-8, 2 units wheel loader Komatsu WA900-3 and 100 units DPRT Scania R580 Cap. 330 m3 compared with 160 units dump truck Komatsu HD785 with intermediate stockpile alternative. The results of the analysis show that the 2nd scenario is the best scenario with the cheapest loading and transportation costs, which is Rp1.727.055.376 or Rp24.542 per m3.. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The activity of moving excavated material from one place to another provides the cost of loading and transporting material that must be borne by the mining company. The cost of loading and transporting can be kept to a minimum by optimizing the number of transportation equipment used and options of the hauling process. PT XYZ is an andesite mine whose products will be used to build a dam. However, the route that must be taken by hauling equipment is quite far, namely 53,225 kilometers from mining front, so we need to find other alternatives to minimize the hauling costs. In this research, the optimization of hauling process will be carried out with the intermediate stockpile on the hauling road and mining equipment changes. The method used in this research is optimization using the Simplex LP Linear Program. In this case, we used the data from the Liebherr R9250, Komatsu PC2000-8, Komatsu WA900-3 loading equipment and the Komatsu HD785 and DPRT Scania R580 Cap. 330 m3 hauling equipment to process the data. There are two scenarios of hauling process and different mining equipment were used, with the aim of producing the lowest loading and transportation costs while still paying attention to achieve the ideal match factor value. In scenario 1, the combination of loading and hauling equipment in the form of 4 units backhoe Komatsu PC2000-8 and 120 units DPRT Scania R580 Cap. 330 m3 compared with 4 units backhoe Liebherr R9250 and 220 units dump truck Komatsu HD785. In scenario 2, the combination of loading and hauling equipment changed in the form of 2 units backhoe Komatsu PC2000-8, 2 units wheel loader Komatsu WA900-3 and 100 units DPRT Scania R580 Cap. 330 m3 compared with 160 units dump truck Komatsu HD785 with intermediate stockpile alternative. The results of the analysis show that the 2nd scenario is the best scenario with the cheapest loading and transportation costs, which is Rp1.727.055.376 or Rp24.542 per m3..
format Final Project
author Darmawan, Michael
spellingShingle Darmawan, Michael
DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
author_facet Darmawan, Michael
author_sort Darmawan, Michael
title DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
title_short DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
title_full DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
title_fullStr DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
title_full_unstemmed DUMP TRUCK OPTIMIZATION FOR ANDESITE TRANSPORT FROM PT. XYZ MINE TO DAM CONSTRUCTION BASED ON FUEL CONSUMPTION AND ADDITION OF INTERMEDIATE STOCKPILE
title_sort dump truck optimization for andesite transport from pt. xyz mine to dam construction based on fuel consumption and addition of intermediate stockpile
url https://digilib.itb.ac.id/gdl/view/72075
_version_ 1822992404570963968