IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
As one of the largest oil companies and has been operating for almost a hundred years in Indonesia, PT BELVIS operation divides into two work areas, namely Sumatra Light Oil (SLO) and Heavy Oil Operation (HOO). In the 1980s PT BELVIS' daily oil production once reached 1 million barrels per d...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/72858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:72858 |
---|---|
spelling |
id-itb.:728582023-06-05T08:18:03ZIMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) Wibowo, Kristanto Manajemen umum Indonesia Theses Hybrid, Rig, Perawatan Sumur, Single Rig, Double Rig, Lean Sigma INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72858 As one of the largest oil companies and has been operating for almost a hundred years in Indonesia, PT BELVIS operation divides into two work areas, namely Sumatra Light Oil (SLO) and Heavy Oil Operation (HOO). In the 1980s PT BELVIS' daily oil production once reached 1 million barrels per day, and this positioned PT BELVIS to become the leader of oil and gas companies in Indonesia with a cumulative production of more than one third of Indonesia's national daily oil production. Wells is one of the functional departments in PT BELVIS where the scope of work is to carry out planning and operating activities of drilling, workover and well service. PT BELVIS has more than ten thousand wells spread across oil fields in the working area of Sumatra. And some of these wells are still actively producing and some are no longer active. In carrying out well maintenance operations, PT BELVIS uses a rig. The types of rigs used in the well service activities are Single and Double Rig. The distinguish of the two types of those rigs is the installation efficiency and speed of completion of a well service activity. The single rig has the advantage of a fast installation process because it only has one rig mast compared to the double rig which has 2 rig mast sections, an upper and lower mast. With this advantage, the Single Rig has a much faster installation time compared to the Double Rig type. While the advantage of the Double Rig type lies in the ability to pick up the pipe in one go, 2 joints of pipe connections. In the local and national markets, a single type of rig is not commonly owned by other oil operators or rig contractors. While the single type of rig owned by PT BELVIS is no longer efficient due to its age. With the considerations of efficiency and safety, PT BELVIS made the decision to discontinue the use of a single type of rig as a support in its well service operations. Under these conditions the time needed to complete a well service program will be disrupted and can cause a well service job to be uneconomical. By using the Lean Six Sigma method, research was made to solve this problem. This method uses a systematic process roadmap, namely Define, Measure, Analyze, Improve and Control or what is often known as DMAIC. This project is intended to maintain the cycle time required to complete a well service program keep economically competitive with the company decision to discontinue the single type of rig operation. From this study it was found that the process of completing a well service program using double rig equipment can provide a cycle time efficiency of 12.3 hours per well service job compared to 16.5 hours per well service job before the initiative implemented. This resulted in a revenue contribution to the company of US$ 1.59 million between May 2021 and April 2022. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Wibowo, Kristanto IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
description |
As one of the largest oil companies and has been operating for almost a hundred years in Indonesia, PT
BELVIS operation divides into two work areas, namely Sumatra Light Oil (SLO) and Heavy Oil
Operation (HOO). In the 1980s PT BELVIS' daily oil production once reached 1 million barrels per
day, and this positioned PT BELVIS to become the leader of oil and gas companies in Indonesia with
a cumulative production of more than one third of Indonesia's national daily oil production.
Wells is one of the functional departments in PT BELVIS where the scope of work is to carry out
planning and operating activities of drilling, workover and well service. PT BELVIS has more than ten
thousand wells spread across oil fields in the working area of Sumatra. And some of these wells are still
actively producing and some are no longer active. In carrying out well maintenance operations, PT
BELVIS uses a rig. The types of rigs used in the well service activities are Single and Double Rig. The
distinguish of the two types of those rigs is the installation efficiency and speed of completion of a well
service activity. The single rig has the advantage of a fast installation process because it only has one
rig mast compared to the double rig which has 2 rig mast sections, an upper and lower mast. With this
advantage, the Single Rig has a much faster installation time compared to the Double Rig type. While
the advantage of the Double Rig type lies in the ability to pick up the pipe in one go, 2 joints of pipe
connections. In the local and national markets, a single type of rig is not commonly owned by other oil
operators or rig contractors. While the single type of rig owned by PT BELVIS is no longer efficient
due to its age. With the considerations of efficiency and safety, PT BELVIS made the decision to
discontinue the use of a single type of rig as a support in its well service operations. Under these
conditions the time needed to complete a well service program will be disrupted and can cause a well
service job to be uneconomical.
By using the Lean Six Sigma method, research was made to solve this problem. This method uses a
systematic process roadmap, namely Define, Measure, Analyze, Improve and Control or what is often
known as DMAIC. This project is intended to maintain the cycle time required to complete a well
service program keep economically competitive with the company decision to discontinue the single
type of rig operation.
From this study it was found that the process of completing a well service program using double rig
equipment can provide a cycle time efficiency of 12.3 hours per well service job compared to 16.5 hours
per well service job before the initiative implemented. This resulted in a revenue contribution to the
company of US$ 1.59 million between May 2021 and April 2022. |
format |
Theses |
author |
Wibowo, Kristanto |
author_facet |
Wibowo, Kristanto |
author_sort |
Wibowo, Kristanto |
title |
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
title_short |
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
title_full |
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
title_fullStr |
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
title_full_unstemmed |
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS) |
title_sort |
improving well service cycle time in rig hub wells department through lean sigma methodology (a case study of pt. belvis) |
url |
https://digilib.itb.ac.id/gdl/view/72858 |
_version_ |
1822006940104916992 |