IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
As one of the largest oil companies and has been operating for almost a hundred years in Indonesia, PT BELVIS operation divides into two work areas, namely Sumatra Light Oil (SLO) and Heavy Oil Operation (HOO). In the 1980s PT BELVIS' daily oil production once reached 1 million barrels per d...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/72858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!