IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
As one of the largest oil companies and has been operating for almost a hundred years in Indonesia, PT BELVIS operation divides into two work areas, namely Sumatra Light Oil (SLO) and Heavy Oil Operation (HOO). In the 1980s PT BELVIS' daily oil production once reached 1 million barrels per d...
Saved in:
Main Author: | Wibowo, Kristanto |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/72858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OIL WELL PUT ON PRODUCTION CYCLE TIME IMPROVEMENT AT IOC-CORP USING LEAN SIX SIGMA METHODOLOGY
by: Sujana Putra, Doni -
WORKOVER AND WELL SERVICE PERFORMANCE IMPROVEMENT USING LEAN SIX SIGMA CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT AAA
by: Adi Prasetyo, Bayu -
CONTINUOUS IMPROVEMENT OF DRILLING ULTRA-SHALLOW HORIZONTAL WELL THROUGH LEAN SIX SIGMA METHODOLOGY (Study Case: UP* Field in PT. SDEC*)
by: Tri Wahyudi, Petrus -
PROCESS IMPROVEMENT DURING INITIAL COOLING DOWN WELL UTILIZING LEAN SIX SIGMA METHOD CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT. AHN
by: Huntadi Nugraha, Alfonsus -
OPERATIONAL TIME & COST IMPROVEMENT FOR ROUTINE SERVICE JOB AT RIG GBT-09 BY USING LEAN SIX SIGMA FRAMEWORK AT BLUE OIL COMPANY
by: Sintong O Tampubolon, Arnold