GREEN ECONOMY EVALUATION OF EOR PROJECTS IN BORNEO FIELD: CASE OF CO2 INJECTION VS CHEMICAL INJECTION
PT Borneo Petroleum Company (BPC) as one of the biggest oil and gas company in Indonesia is planning to perform Enhanced Oil Recovery in Borneo Field. It is considering performing chemical injection (CEOR) or CO2 injection. As CO2 injection requires bigger capital investment than CEOR, it becomes le...
Saved in:
Main Author: | Made Agusyasa, I |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/72875 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FIELD DEVELOPMENT OPTIMISATION STRATEGY FOR MATURE FIELD CASE STUDY IN BORNEO OIL COMPANY
by: Anarta, Andy -
FEASIBILITY & WELL BASIC PARAMETERS AT TUNA FIELD PT. MAHAKAM HULU BORNEO, EAST KALIMANTAN, INDONESIA
by: Betha Guardena, Feli -
DECISION MAKING TO IMPROVE RELIABILITY WATER INJECTION PUMP AT PH GATHERING STATION PT. ABC
by: Eko Prasetyo, M. -
SELECTING OUTDOOR WIRELESS SOLUTION FOR BARA PRIMA BORNEO USING ANALYTIC HIERARCHY PROCESS
by: Goemilang Sinaga, Goemmi -
INVESTMENT PROJECT ANALYSIS OF GAS FIELD DEVELOPMENT PROJECT: CASE STUDY OF EASTERN FLANK AREA AT TAMBOURINE FIELD
by: Vicha Putra, Frizal