USE OF BORED PILED AS A METHOD OF STRENGTHENING BUILDING FOUNDATIONS.CASE STUDY : MARGATIGA DAM, LAMPUNG
The design of a dam must meet four main criteria: being safe from structural failure, safe from hydraulic failure, safe from failure due to seepage, and safe from operational and maintenance failures of the dam (Centre for Education and Training in Water Resources and Construction, 2017). The det...
Saved in:
Main Author: | Gusti Nyoman Ari Suryanatha, I |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/75321 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF RETAINING WALL AND RAFT WITH BORED PILE FOUNDATION FOR HOSPITAL BUILDING IN WEST JAKARTA
by: Nainggolan, Tommy -
BORED PILES FOUNDATION AND DIAPHRAGM WALL DESIGN OF 32 FLOOR APARTMENT BUILDING WITH 2 FLOOR BASEMENT
by: SULAIMAN, AHMAD -
DESIGN OF BORED PILE FOUNDATION LIFESTYLE CENTER SUMMARECON BANDUNG PROJECT
by: HAWARI (NIM: 15013154), KASYFU -
DESIGN OF EMBANKMENT, BORED PILES FOUNDATION, AND ABUTMENT ANALYSIS FOR INTERCHANGE KARAWANG
by: Putra Sri Kasta, Galih -
DESIGN OF BORED PILE FOUNDATION AND SHEET PILE TEMPORARY RETAINING WALL WITH STRUTTING SYSTEM FOR CREATIVE DIGITAL OFFICE BUILDING IN SOUTH JAKARTA
by: Ary Maulana Nugroho, Irvan