FINANCIAL FEASIBILITY STUDY ON ANTAM PONGKOR LOW-GRADE GOLD ORE MINE AFTER IMPLEMENTING BUSINESS-LEVEL STRATEGY
Antam operating segments are distinguished according to three core businesses (a) nickel, (b) gold and refinery, and (c) bauxite and alumina. The gold and refinery operating segment are comprised of gold and silver mining, Gold and silver are produced from mining and smelting of gold ore into gold b...
Saved in:
Main Author: | Adi Putra, Hoppy |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75920 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BUSINESS STRATEGY EFFECTIVENESS OF A PILOT PROJECT FOR COOPERATIVES OF ILLEGAL GOLD MINERS: A CASE STUDY OF ANTAM PONGKOR GOLD MINE
by: Imam Prasetyo, Sodiek -
Study on the Use of Biopolymer from Wood Extraction as an Additive in Gold Cyanidation Process to Improve Gold Recovery at Antam Pongkor Gold Mine
by: (NIM : 22109303), CHANDRA -
MODELLING OF GOLD MINERALIZATION ZONE BASED ON GRADE, LITHOLOGY AND ALTERATION DOMAINS IN PT ANTAM UBPE PONGKOR, BOGOR, WEST JAVA
by: Akmal, Muhammad -
ASSESSING THE CREATION OF SPV IN THE INTEGRATION OF ANTAM'S MARGINAL AND MINORITY-INTEREST GOLD MINES TO OPTIMIZE ANTAM'S GOLD BUSINESS SECTOR
by: Apriyanto, Andi -
INVESTMENT OPTIMIZATION FOR GOLD VEIN MINING WITH OPTIONAL CUT-OFF-GRADE AND FUZZY REAL OPTION METHODS : CASE STUDY OF VEIN KUBANG CICAU PT ANTAM TBK PONGKOR
by: Sibarani, Sariuly