DESIGN OF BORED PILE FOUNDATION AND SLOPE STABILITY OF BALANCED CANTILEVER BRIDGE STUDY CASE: DESIGN ALTERNATIVE FOR MAINROAD GLADAK BRIDGE

Gladak Mainroad Bridge is one of the sub-projects of the Yogyakarta-Bawen Toll Road Construction Project under Section 5: Ambarawa-Temanggung, which connects separate sections of the toll road separated by a slope with the Gladak River underneath. The purpose of this final project is to design a...

Full description

Saved in:
Bibliographic Details
Main Author: Zhafran Puturahmadika, Mahdy
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/77144
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia