DESIGN OF BORED PILE FOUNDATION AND SLOPE STABILITY OF BALANCED CANTILEVER BRIDGE STUDY CASE: DESIGN ALTERNATIVE FOR MAINROAD GLADAK BRIDGE
Gladak Mainroad Bridge is one of the sub-projects of the Yogyakarta-Bawen Toll Road Construction Project under Section 5: Ambarawa-Temanggung, which connects separate sections of the toll road separated by a slope with the Gladak River underneath. The purpose of this final project is to design a...
Saved in:
Main Author: | Zhafran Puturahmadika, Mahdy |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/77144 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ALTERNATIVE DESIGN FOR GLADAK MAINROAD BRIDGE (STA 11+395) YOGYAKARTA-BAWEN TOLL ROAD SECTION 5 USING BALANCED CANTILEVER METHOD
by: Revansyah Musa Marbun, Aditya -
DESIGN OF BORED PILES AND CANTILEVER RETAINING WALLS FOR PADALARANG FLY OVER
by: Faisal Mumtaz, Rezaldy -
RELIABILITY OF BALANCE CANTILEVER BRIDGE USING FRICTION TYPE BASE ISOLATOR
by: Cangjaya, Kevin -
DESIGN OF BORED PILE FOUNDATION LIFESTYLE CENTER SUMMARECON BANDUNG PROJECT
by: HAWARI (NIM: 15013154), KASYFU -
DESIGN OF EMBANKMENT, BORED PILES FOUNDATION, AND ABUTMENT ANALYSIS FOR INTERCHANGE KARAWANG
by: Putra Sri Kasta, Galih