DESIGN OF CONSTRUCTION MANAGEMENT ASPECT FOR BRIDGE PROJECTS USING THE BALANCED CANTILEVER METHOD

The Gladak Bridge with the Balanced Cantilever Method in Semarang Regency is designed as a toll road connector between Ambarawa and Temanggung. This bridge consists of two prestressed concrete bridges designed identically for both directions. The bridge spans a gorge of 145 meters wide with a depth...