DESIGN OF CONSTRUCTION MANAGEMENT ASPECT FOR BRIDGE PROJECTS USING THE BALANCED CANTILEVER METHOD
The Gladak Bridge with the Balanced Cantilever Method in Semarang Regency is designed as a toll road connector between Ambarawa and Temanggung. This bridge consists of two prestressed concrete bridges designed identically for both directions. The bridge spans a gorge of 145 meters wide with a depth...
Saved in:
Main Author: | Arifin, David |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77250 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RELIABILITY OF BALANCE CANTILEVER BRIDGE USING FRICTION TYPE BASE ISOLATOR
by: Cangjaya, Kevin -
Initial shape analysis of cable-stayed bridges during construction by the cantilever method
by: Somxai Phongsawat
Published: (2012) -
DESIGN OF BORED PILE FOUNDATION AND SLOPE STABILITY OF BALANCED CANTILEVER BRIDGE STUDY CASE: DESIGN ALTERNATIVE FOR MAINROAD GLADAK BRIDGE
by: Zhafran Puturahmadika, Mahdy -
STRUCTURAL PLANNING OF PRESTRESSED BRIDGE WITH SEGMENTAL BOX GIRDER CONCRETE AND BALANCED CANTILEVER CAST IN-SITU METHOD
by: Ilham Ramadhan, Akhmad -
ALTERNATIVE DESIGN FOR GLADAK MAINROAD BRIDGE (STA 11+395) YOGYAKARTA-BAWEN TOLL ROAD SECTION 5 USING BALANCED CANTILEVER METHOD
by: Revansyah Musa Marbun, Aditya