DECISION ANALYSIS OF OFFSHORE CHANNEL MAINTENANCE DREDGING IN PT PERTAMINA HULU MAHAKAM
In December 2022, channel mainetanance dredging project was started at PT. Pertamina Hulu Mahakam offshore seafaring line. The initial plan for this project was to be done on 5 April 2023 (96.6 days) with one clamshell dredger and three set of hopper barges which were towed by two tug boats and one...
Saved in:
Main Author: | Adhitya Gangga, Rahadhian |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/77165 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ASSESSMENT OF ORGANIZATION TRANSFORMATION READINESS: CASE STUDY PT PERTAMINA HULU MAHAKAM
by: Ferico -
SAFETY BEHAVIOR ANALYSIS IN THE DRILLING RIG SITE OPERATIONS OF PERTAMINA HULU MAHAKAM
by: Agriawan, Crisa -
IMPLEMENTATION OF NEW TECHNICAL CODES AND SPECIFICATIONS WITH CONCEPT OF FIT FOR SERVICE DESIGN TO OPTIMIZE PROJECT AND MODIFICATION COST IN MAHAKAM BLOK PT PERTAMINA HULU MAHAKAM
by: Purwanto, Tri -
OPTIMIZING TUGBOAT PERFORMANCE ON TOWING OPERATION OF RIG AT PT PERTAMINA HULU MAHAKAM THROUGH ENHANCE TECHNICAL EVALUATION
by: Sudan Pramudianta, Dicky -
MEASURING THE CRITICAL SUCCESS FACTOR OF SAFETY PROGRAMS IN DRILLING AND WELL INTERVENTION OPERATIONS AT PT PERTAMINA HULU MAHAKAM
by: Wiyono Sakuro Putro, Ronggo