DESIGN AND CROSSING SUBSEA PIPELINE ANALYSIS USINGGROUT BAG AS SUPPORT OFF THE COAST OF WEST JAVA
In the process of planning underwater pipelines, there are often issues where a route of the underwater pipeline being constructed intersects with the route of an existing underwater pipeline from a previous project. To prevent direct contact between the existing and new pipelines, support struct...
Saved in:
Main Author: | Santoso, Dave |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77215 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SUBSEA PIPELINE DESIGN AND CROSSING ANALYSIS
by: Gloriani Putri - NIM 15514038 , Irene -
DESIGN AND CATHODIC PROTECTION ANALYSIS OF SUBSEA PIPELINE IN KARANG ESTUARY WATERS, WEST JAVA
by: Butar-Butar, Ika -
DESIGN AND ANALYSES OF SUBSEA PIPELINE IN THE JAVA SEA
by: Gabrielle - NIM 15514078 , Daoni -
DESIGN AND CROSSING SUBSEA PIPELINES ANALYSIS AT MADURA STRAIT USING CONCRETE SLEEPER AS SUPPORT
by: Gunawan, Jeremy -
DESIGN OF SUBSEA PIPELINE FOR THE NUSANTARA PROJECT IN JAVA SEA
by: Anka, Logidea