STABILITY EVALUATION AND DESIGN SUPPORT OF TUNNEL ACCESS RAMP UP 4 CENTRAL CIURUG L450 PT. ANEKA TAMBANG TBK UBPE PONGKOR.
Tunnel access ramp up 4 central mine Ciurug L450 is a tunnel of transportation production with the aim of connecting the Ramp Down Central Level 450 to cross cut leading to the ore bodies later. Type supporting applied to the tunnel advances in the form of split set 1,40 m long, spaced 1,0x1,0 m2...
Saved in:
Main Author: | Yatjong, Isramyano |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/78499 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
by: RADINA WIBISONO (NIM : 12113084), PANDU -
STUDY OF HYDROGEOLOGICAL CHARACTERISTICS FOR CONSIDERATION OF MINE DEWATERING PLAN AT CIURUG VEIN PT. ANEKA TAMBANG, TBK UBPE PONGKOR
by: DWIKA PARAMANANDA (NIM : 12113017), I.K. -
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
MEASURENTMENT OF RESISTANCE AT AIRWAYS AND VENTILATION SYSTEM NETWORK ANALYSIS IN MINE CIURUG UBPE PONGKOR, PT. ANEKA TAMBANG Tbk. USING SIMULATOR KAZEMARU
by: AKHMAD YUNADI (NIM 12101038); Pembimbing: Dr. Nuhindro Priagung Widodo, ST.,MT., NINO -
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ