STABILITY EVALUATION AND DESIGN SUPPORT OF TUNNEL ACCESS RAMP UP 4 CENTRAL CIURUG L450 PT. ANEKA TAMBANG TBK UBPE PONGKOR.

Tunnel access ramp up 4 central mine Ciurug L450 is a tunnel of transportation production with the aim of connecting the Ramp Down Central Level 450 to cross cut leading to the ore bodies later. Type supporting applied to the tunnel advances in the form of split set 1,40 m long, spaced 1,0x1,0 m2...

Full description

Saved in:
Bibliographic Details
Main Author: Yatjong, Isramyano
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78499
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first