STUDY ON IMPLEMENTATION OF BIM 7D IN BUILDING PROJECTS IN INDONESIACASE STUDY : MANDIRI WIJAYAKUSUMA TOWER PROJECT
Generally, information and communication technology are very helpful in the building life cycle cost management process. Previous research shows that costs in the building operational phase are the main contributor to determining the amount of building life cycle costs. Currently, most of the Bui...
Saved in:
Main Author: | Faiz Putra, Auditya |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80437 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON IMPLEMENTATION OF THE MINISTRY OF PUPR'S 2020 BIM PROTOCOL STANDARDS CASE STUDY : NAHDLATUL ULAMA UNIVERSITY (UNU) YOGYAKARTA BUILDING CONSTRUCTION PROJECT
by: Faiz Putra, Auditya -
EVALUATION STUDY OF IMPLEMENTATION LEAN CONSTRUCTION ON BUILDING PROJECT IN INDONESIACASE STUDY : BUILDING CONSTRUCTION WORKS FOR MOTHER AND CHILD HEALTH CARE CENTER DR. HASAN SADIKIN HOSPITAL BANDUNG
by: Vinesa Ulima, Zefanya -
EVALUATION STUDY OF BUILDING INFORMATION MODELING (BIM) IMPLEMENTATION IN INDONESIAN CONSTRUCTION PROJECTS
by: Hanifah, Yulita -
ADOPTION OF 7D BIM TO INCREASE EFFICIENCY DURING O&M STAGE IN BUILDING PROJECTS
by: NURFAEIQAH BTE OMAR
Published: (2023) -
ANALYSIS THE CORRELATION OF THE IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) ON COST AND TIME PERFORMANCE OF CONSTRUCTION PROJECTS
by: Hanif Hafizhuddin, Wildan