ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)

Saved in:
Bibliographic Details
Main Author: Adlan Wiraprakoso, Hafizhan
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/80650
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:80650
spelling id-itb.:806502024-02-20T11:19:12ZROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT) Adlan Wiraprakoso, Hafizhan Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80650 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Theses
author Adlan Wiraprakoso, Hafizhan
spellingShingle Adlan Wiraprakoso, Hafizhan
ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
author_facet Adlan Wiraprakoso, Hafizhan
author_sort Adlan Wiraprakoso, Hafizhan
title ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
title_short ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
title_full ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
title_fullStr ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
title_full_unstemmed ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG – KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
title_sort road maintenance programming based on iri prediction analysis using aashto 2008 (mepdg) and irms method (case study: pematang panggang – kayu agung sta 294+000 until 304+000 toll road segment)
url https://digilib.itb.ac.id/gdl/view/80650
_version_ 1822996886244556800