ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG â KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80650 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!