ROAD MAINTENANCE PROGRAMMING BASED ON IRI PREDICTION ANALYSIS USING AASHTO 2008 (MEPDG) AND IRMS METHOD (CASE STUDY: PEMATANG PANGGANG â KAYU AGUNG STA 294+000 UNTIL 304+000 TOLL ROAD SEGMENT)
Saved in:
Main Author: | Adlan Wiraprakoso, Hafizhan |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80650 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF CALIBRATION FACTOR TO IRI AASHTO MEPDG MODEL FOR ASPHALT OVERLAYS OF RIGID PAVEMENT ON SURABAYA GRESIK TOLL ROAD
by: Endy Adiyatma, Muhammad -
EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG - KAYU AGUNG (STA 140+000 S.D. 161+600)
by: Fatra Hadi, Jehant -
EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG â KAYU AGUNG (STA 140+000 S.D. 161+600)
by: Aprilya, Priquela -
ANALYSIS OF REMAINING SERVICE LIFE PREDICTION FOR FLEXIBLE PAVEMENT USING AASHTO 1993 METHOD AND BINA MARGA 2021 GUIDELINES(CASE STUDY: TRANS SUMATERA TOLL ROAD SECTION TERBANGGGI BESAR - PEMATANG PANGGANG)
by: Rahman, Aulia -
ANALYSIS AND EVALUATION STUDY OF SOIL IMPROVEMENT DESIGN CHANGES FROM VACUUM METHOD TO DEEP SOIL MIXING (DSM) CASE STUDY: TRANS SUMATRA TOLL ROAD ON THE CONSTRUCTION OF PEMATANG PANGGANG â KAYU AGUNG TOLL ROAD STA 109+000 TO STA 109+300, SOUTH SUMATRA
by: Anggi Syahputra Pohan, Heri