IMPROVING PROJECT SCHEDULE ACCURACY OF MEDIUM SCALE CONSTRUCTION PROJECT THROUGH PERT ANALYSIS.
The problem that will be investigated in this thesis is based on the current data on several construction projects of correctional facilities done by PT Griya Cemerlang Sejahtera (PT. GCS). This company has similar projects and earned value data. PT. GCS expanded to other cities all over Indonesia a...
Saved in:
Main Author: | Hidayatullah, Roby |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/80854 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MINIMIZING DELAY IN CONSTRUCTION PROJECT AT PT FREEPORT INDONESIA WITH THE CRASHING CPM-PERT APPROACH AND MONTE CARLO SIMULATION
by: Nuranto Kurniawan, Budi -
IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
by: Gino Simanjuntak, Maychel -
IMPROVING PROJECT MANAGEMENT OF TYPE 48 HOUSE CONSTRUCTION PROJECT AT CV. PINGGIRAN PUTRA ABADI
by: Alena Azizah, Mutiara -
IMPROVEMENT OF PROJECT PERFORMANCE THROUGH WELL CANDIDATES MATURATION ANALYSIS(A PROJECT MANAGEMENT CASE STUDY OF NESSA FIELD)
by: Hadi Harnianto, Syamsul -
INVESTMENT PROJECT ANALYSIS OF CONSTRUCTION MAINTENANCE PROJECT (CASE STUDY FOR PT.ABC)
by: Ghoffaar Noorwandi, Abdul