THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)

<p align="justify">This study aims to design a PCI girder bridge with a single pile pier for the road relocation project at Aek Latong, North Sumatra, at STA 7+400. The background of this research is the need for safe and durable infrastructure to support mobility and accessibility i...

Full description

Saved in:
Bibliographic Details
Main Author: Jericho Sutanto, Reinhart
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/81493
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:81493
spelling id-itb.:814932024-06-28T09:09:37ZTHE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA) Jericho Sutanto, Reinhart Indonesia Final Project bridge design, PCI girder, single pile pier, Midas Civil 2019, SNI 2833:2016, road relocation, Aek Latong. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81493 <p align="justify">This study aims to design a PCI girder bridge with a single pile pier for the road relocation project at Aek Latong, North Sumatra, at STA 7+400. The background of this research is the need for safe and durable infrastructure to support mobility and accessibility in an area situated on the Sumatra fault, which frequently causes structural damage. The methodology includes structural analysis using Midas Civil 2019 software for modeling and structural analysis, along with manual calculations to validate the analysis results. The findings indicate that the bridge design with PCI girder and single pile pier possesses adequate strength and stability for both service and seismic conditions, and complies with SNI 2833:2016 standards for earthquake resistance planning for bridges. Additionally, this thesis compares the structural effectiveness with other studies. The comparative study involves a structural design with similar conditions and location but utilizes portal piers and different girder spacing. In conclusion, the designed bridge structure can withstand service loads and seismic forces, making it suitable for the specified location. Regarding structural effectiveness, several conclusions are drawn based on various comparative categories, highlighting that each type of structure has advantages and disadvantages in specific categories.<p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">This study aims to design a PCI girder bridge with a single pile pier for the road relocation project at Aek Latong, North Sumatra, at STA 7+400. The background of this research is the need for safe and durable infrastructure to support mobility and accessibility in an area situated on the Sumatra fault, which frequently causes structural damage. The methodology includes structural analysis using Midas Civil 2019 software for modeling and structural analysis, along with manual calculations to validate the analysis results. The findings indicate that the bridge design with PCI girder and single pile pier possesses adequate strength and stability for both service and seismic conditions, and complies with SNI 2833:2016 standards for earthquake resistance planning for bridges. Additionally, this thesis compares the structural effectiveness with other studies. The comparative study involves a structural design with similar conditions and location but utilizes portal piers and different girder spacing. In conclusion, the designed bridge structure can withstand service loads and seismic forces, making it suitable for the specified location. Regarding structural effectiveness, several conclusions are drawn based on various comparative categories, highlighting that each type of structure has advantages and disadvantages in specific categories.<p align="justify">
format Final Project
author Jericho Sutanto, Reinhart
spellingShingle Jericho Sutanto, Reinhart
THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
author_facet Jericho Sutanto, Reinhart
author_sort Jericho Sutanto, Reinhart
title THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
title_short THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
title_full THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
title_fullStr THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
title_full_unstemmed THE DESIGN OF PCI GIRDER BRIDGE WITH SINGLE PILE PIER (CASE STUDY ROAD RELOCATION PROJECT AT AEK LATONG NORTH SUMATERA)
title_sort design of pci girder bridge with single pile pier (case study road relocation project at aek latong north sumatera)
url https://digilib.itb.ac.id/gdl/view/81493
_version_ 1822281927216857088