EVALUATION AND OPTIMIZATION OF PRESTRESSED CONCRETE I GIRDER DESIGN FOR CONSTRUCTION COST INVESTMENT PLANNING OF TRANS SUMATERA TOLL ROAD BRIDGE PROJECT
<p align="justify">PCI Girder bridges are the most commonly used type of bridge for the construction of the Trans Sumatera toll road. The designs of these bridges vary greatly depending on the design consultant. Generally, cost aspects are not considered in the design planning of PCI...
Saved in:
Main Author: | Ihsan, M. |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Computer-aided design for continuous prestressed concrete box-girder bridges
by: Fan, Sau Cheong
Published: (2011) -
INVESTMENT ANALYSIS FOR TRANS SUMATERA TOLL ROAD, BETUNGTEMPINO-JAMBI TOLL ROAD SECTION
by: Pramana, Heru -
Long-Term Deflection of Prestressed Concrete Box Girder Bridges Due To Creep and Shrinkage
by: Purba, Luki Hariando, et al.
Published: (2023) -
FAILURE INVESTIGATION OF PRESTRESSED CONCRETE BEAMS BECAKAYU TOLL ROAD
by: MARTAHAN NAINGGOLAN - NIM : 25016017, TAMBOS -
CONTINUOUS GIRDER BRIDGE STRUCTURAL DESIGN MANADO-BITUNG TOLL ROAD
by: Siswaji, Vincent