EVALUATION STUDY ON THE POTENTIAL IMPLEMENTATION OF LOCATION BASED PLANNIG SYSTEM (LBPS) AS A PROJECT SCHEDULLING TOOLS. CASE STUDY : UNDERGRAOUND STRUCTURE WORK OF LABTEK XV DEVELOPMENT PROJECT, BANDUNG INSTITUTE OF TECHNOLOGY
Saved in:
Main Author: | Patricia J. Tampubolon, Audrey |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82371 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY ON THE IMPLEMENTATION OF TAKT PLANNING IN THE SUPERSTRUCTURE WORK OF THE LABTEK XV ITB BUILDING CONSTRUCTION PROJECT
by: Aaliyah Setiawan, Putri -
BERTH ALLOCATION PLANNIG USING GENETIC ALGORITHM
by: YING YOU MEI
Published: (2020) -
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
by: ANDITA SETYA PERMATASARI , CICILIA -
TEMPERATURE HUMIDITY INDEX (THI) STUDY FOR 8 YEARS (2012-2019) AT BANDUNG INSTITUTE OF TECHNOLOGY (CASE STUDY: TAMAN ALAT LABTEK XI ITB)
by: Asyana Nugraha, Dera -
Phase transitions in project scheduling
by: HERROELEN, Willy, et al.
Published: (1999)