ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)

Saved in:
Bibliographic Details
Main Author: Iftikar Naufal An-Nashry, Radwa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/82373
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:82373
spelling id-itb.:823732024-07-08T09:27:41ZANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK) Iftikar Naufal An-Nashry, Radwa Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82373 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Final Project
author Iftikar Naufal An-Nashry, Radwa
spellingShingle Iftikar Naufal An-Nashry, Radwa
ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
author_facet Iftikar Naufal An-Nashry, Radwa
author_sort Iftikar Naufal An-Nashry, Radwa
title ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
title_short ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
title_full ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
title_fullStr ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
title_full_unstemmed ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
title_sort analysis of constraints and strategies in the adoption of production planning within the last planner system in indonesia (case study: pt pembangunan perumahan tbk)
url https://digilib.itb.ac.id/gdl/view/82373
_version_ 1823656235565580288