ANALYSIS OF CONSTRAINTS AND STRATEGIES IN THE ADOPTION OF PRODUCTION PLANNING WITHIN THE LAST PLANNER SYSTEM IN INDONESIA (CASE STUDY: PT PEMBANGUNAN PERUMAHAN TBK)
Saved in:
Main Author: | Iftikar Naufal An-Nashry, Radwa |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82373 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CORPORATE STRATEGY IN MERGER PLANS FOR STATE OWNED ENTERPRISES OF CONSTRUCTION COMPANIES (PT. PEMBANGUNAN PERUMAHAN TBK, AND PT. WIJAYA KARYA TBK)
by: Hafizh, Naufal -
STUDY OF PRODUCTION PLANNING IN LAST PLANNER SYSTEM (LPS) IMPLEMENTATION :CASE STUDY OF PROJECT X
by: Nadya Pramesti Dwi Putranti, Rr -
LAST PLANNER SYSTEM IMPLEMENTATION IN INDONESIA (CASE STUDY: 2 BUMN CONSTRUCTION COMPANIES)
by: Luh Ayu Indrayani, Ni -
IMPLEMENTATION OF LAST PLANNER SYSTEM TO IMPROVE PROJECT PRODUCTIVTY (CASE STUDY: PT. INOMATA KONSULTAMA)
by: Surianta Sembiring, Hendra -
WedPlanner : web application for planning wedding events
by: A Abdul Hakeem
Published: (2021)