#TITLE_ALTERNATIVE#
Railway crossings cause delay to traffic. This study focused on delay when the gates were open. A two lane approach in one direction, on a dual railway crossing at jalan Laswi in Bandung, was observed during one day. Analysis was confined to two hours, i.e. 7.00 to 8.00 am during the morning peak pe...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8319 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |