#TITLE_ALTERNATIVE#
Railway crossings cause delay to traffic. This study focused on delay when the gates were open. A two lane approach in one direction, on a dual railway crossing at jalan Laswi in Bandung, was observed during one day. Analysis was confined to two hours, i.e. 7.00 to 8.00 am during the morning peak pe...
Saved in:
Main Author: | RIANTO (NIM 26995016), JANU |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8319 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Rianto Kurniawan (NIM: 20804001), Alwin -
#TITLE_ALTERNATIVE#
by: FIKRIANA SUHILMAN (NIM : 13606050); Dosen Pembimbing : Dr. Rianto Adhy Sasongko, ARDHESA -
#TITLE_ALTERNATIVE#
by: HARDIAN (NIM : 13604056); Pembimbing : Dr. Taufiq Mulyanto; Dr. Rianto Adhy Sasongko, -
#TITLE_ALTERNATIVE#
by: KIMSAY (NIM : 23109021); Pembimbing : Dr. Leonardo Gunawan; Dr. Rianto Adhy Sasongko, SIN -
#TITLE_ALTERNATIVE#
by: PRABU MENARA (NIM : 13607008); Pembimbing : Dr. Rianto Adhy Sasongko; Dr. Ing M. Agoes Moelyad, GANDI