#TITLE_ALTERNATIVE#

Railway crossings cause delay to traffic. This study focused on delay when the gates were open. A two lane approach in one direction, on a dual railway crossing at jalan Laswi in Bandung, was observed during one day. Analysis was confined to two hours, i.e. 7.00 to 8.00 am during the morning peak pe...

Full description

Saved in:
Bibliographic Details
Main Author: RIANTO (NIM 26995016), JANU
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/8319
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first