ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
The signaling system used in Jabodebek LRT is the Communication Based Train Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving block and autonomous train system. The CBTC GoA 3 signaling system of Jabodebek LRT has a complex system with several types o...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83210 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The signaling system used in Jabodebek LRT is the Communication Based Train
Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving
block and autonomous train system. The CBTC GoA 3 signaling system of
Jabodebek LRT has a complex system with several types of new equipment and is
different from the existing trains in PT Kereta Api Indonesia (Persero). This system
was first implemented in Indonesia, so to ensure the safety of train operations,
optimal preventive maintenance is needed on the signaling equipment. The purpose
of this research is to evaluate the maintenance program that has been implemented
and design an effective preventive maintenance scheduling, by optimizing resources
and overcoming operational obstacles.
The research methodology includes literature study, data collection through
interviews and observations, as well as data analysis of maintenance programs and
realizations for nine months. And using the Integer Linear Programming (ILP)
method to model and optimize the maintenance schedule, taking into account
various constraints such as limited maintenance time and the number of available
personnel. This research focuses on evaluating the maintenance program that has
been carried out and designing a new schedule that is in accordance with the
Jabodebek LRT operational conditions.
The analysis results show that the maintenance program increased from 36.04%
(December 2023) to 89.53% (May 2024), during the 9-month period the
maintenance program has not achieved 100% due to several factors. The reliability
of the CBTC GoA 3 Jabodebek LRT signaling system targeted at 99.36% can be
successfully achieved, if with the reliability of each equipment system reaching
99.84% for infrastructure equipment and 99.68% for the onboard subsystem. The
results of the ILP approach calculation to determine the number of personnel
requirements are 12 personnel for the maintenance of Jabodebek LRT signaling
equipment. And the result of scheduling planning is a scheduling table that contains
the division of teams (personnel) on each day with details of the work to be done.
|
---|