ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK

The signaling system used in Jabodebek LRT is the Communication Based Train Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving block and autonomous train system. The CBTC GoA 3 signaling system of Jabodebek LRT has a complex system with several types o...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Raharjo, Rachmad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/83210
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:83210
spelling id-itb.:832102024-08-05T14:08:24ZANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK Dwi Raharjo, Rachmad Indonesia Theses Signaling System, Preventive Maintenance, Scheduling, Integer Linear Programming INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/83210 The signaling system used in Jabodebek LRT is the Communication Based Train Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving block and autonomous train system. The CBTC GoA 3 signaling system of Jabodebek LRT has a complex system with several types of new equipment and is different from the existing trains in PT Kereta Api Indonesia (Persero). This system was first implemented in Indonesia, so to ensure the safety of train operations, optimal preventive maintenance is needed on the signaling equipment. The purpose of this research is to evaluate the maintenance program that has been implemented and design an effective preventive maintenance scheduling, by optimizing resources and overcoming operational obstacles. The research methodology includes literature study, data collection through interviews and observations, as well as data analysis of maintenance programs and realizations for nine months. And using the Integer Linear Programming (ILP) method to model and optimize the maintenance schedule, taking into account various constraints such as limited maintenance time and the number of available personnel. This research focuses on evaluating the maintenance program that has been carried out and designing a new schedule that is in accordance with the Jabodebek LRT operational conditions. The analysis results show that the maintenance program increased from 36.04% (December 2023) to 89.53% (May 2024), during the 9-month period the maintenance program has not achieved 100% due to several factors. The reliability of the CBTC GoA 3 Jabodebek LRT signaling system targeted at 99.36% can be successfully achieved, if with the reliability of each equipment system reaching 99.84% for infrastructure equipment and 99.68% for the onboard subsystem. The results of the ILP approach calculation to determine the number of personnel requirements are 12 personnel for the maintenance of Jabodebek LRT signaling equipment. And the result of scheduling planning is a scheduling table that contains the division of teams (personnel) on each day with details of the work to be done. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The signaling system used in Jabodebek LRT is the Communication Based Train Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving block and autonomous train system. The CBTC GoA 3 signaling system of Jabodebek LRT has a complex system with several types of new equipment and is different from the existing trains in PT Kereta Api Indonesia (Persero). This system was first implemented in Indonesia, so to ensure the safety of train operations, optimal preventive maintenance is needed on the signaling equipment. The purpose of this research is to evaluate the maintenance program that has been implemented and design an effective preventive maintenance scheduling, by optimizing resources and overcoming operational obstacles. The research methodology includes literature study, data collection through interviews and observations, as well as data analysis of maintenance programs and realizations for nine months. And using the Integer Linear Programming (ILP) method to model and optimize the maintenance schedule, taking into account various constraints such as limited maintenance time and the number of available personnel. This research focuses on evaluating the maintenance program that has been carried out and designing a new schedule that is in accordance with the Jabodebek LRT operational conditions. The analysis results show that the maintenance program increased from 36.04% (December 2023) to 89.53% (May 2024), during the 9-month period the maintenance program has not achieved 100% due to several factors. The reliability of the CBTC GoA 3 Jabodebek LRT signaling system targeted at 99.36% can be successfully achieved, if with the reliability of each equipment system reaching 99.84% for infrastructure equipment and 99.68% for the onboard subsystem. The results of the ILP approach calculation to determine the number of personnel requirements are 12 personnel for the maintenance of Jabodebek LRT signaling equipment. And the result of scheduling planning is a scheduling table that contains the division of teams (personnel) on each day with details of the work to be done.
format Theses
author Dwi Raharjo, Rachmad
spellingShingle Dwi Raharjo, Rachmad
ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
author_facet Dwi Raharjo, Rachmad
author_sort Dwi Raharjo, Rachmad
title ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
title_short ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
title_full ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
title_fullStr ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
title_full_unstemmed ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
title_sort analysis and recommendations for maintenance scheduling of outdoor signaling equipment on autonomous trains lrt jabodebek
url https://digilib.itb.ac.id/gdl/view/83210
_version_ 1822009993235267584