ANALYSIS AND RECOMMENDATIONS FOR MAINTENANCE SCHEDULING OF OUTDOOR SIGNALING EQUIPMENT ON AUTONOMOUS TRAINS LRT JABODEBEK
The signaling system used in Jabodebek LRT is the Communication Based Train Control (CBTC) Grade of Automation (GoA) level 3 system, which is a moving block and autonomous train system. The CBTC GoA 3 signaling system of Jabodebek LRT has a complex system with several types o...
Saved in:
Main Author: | Dwi Raharjo, Rachmad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83210 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FAILURE POTENTIAL AND RELIABILITY ANALYSIS OF LRT JABODEBEK BOGIE
by: Rafif, Alim -
STATIC AND CYCLIC STRESS ANALYSIS OF LRT JABODEBEK POWERED AXLE
by: Luhur Pambudi, Prihandaru -
IDENTIFICATION OF THE IMPACT OF JABODEBEK LIGHT RAIL TRANSIT (LRT)
by: Samalo, William -
OPTIMIZATION OF SPEED PROFILES FOR TRACTION ENERGY SAVINGS ON THE JABODEBEK LRT
by: Abdillah, Kusuma -
Analyze the Strength of Jabodebek LRT Carbody Structure with Finite Element Method
by: Yuliandri Pratama NIM : 13114102, Oki