MINIMIZING DELAY IN CONSTRUCTION PROJECT AT PT FREEPORT INDONESIA WITH THE CRASHING CPM-PERT APPROACH AND MONTE CARLO SIMULATION
The global transition to clean energy necessitates a shift towards more sustainable mining practices for critical materials. Copper, an essential commodity in this transition, is extracted in the eastern region of Indonesia by PT Freeport Indonesia. The company is increasing its production from unde...
Saved in:
Main Author: | Nuranto Kurniawan, Budi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/83389 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVING PROJECT SCHEDULE ACCURACY OF MEDIUM SCALE CONSTRUCTION PROJECT THROUGH PERT ANALYSIS.
by: Hidayatullah, Roby -
MINIMIZING DELAY TIME OF PROJECT COMPLETION (CASE OF PT.ANXX)
by: Eka Putra, Kaizman -
MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
by: Khaerunnisa, Soraya -
INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
by: Boediarto, Gunawan -
PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)
by: Nadrul Jamal, M