PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS

PT. Garuda Metalindo is a producer of fasteners and engineering components, committed to delivering 100% defect-free products. However, recent customer complaints have highlighted discrepancies between product standards and received goods. The Quality Control Department (QC) at Plant 3 (GM 3) bea...

Full description

Saved in:
Bibliographic Details
Main Author: Antonio, Steven
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/83755
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:83755
spelling id-itb.:837552024-08-13T07:47:43ZPERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS Antonio, Steven Indonesia Final Project quality control, standards, waste, effective, efficient. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/83755 PT. Garuda Metalindo is a producer of fasteners and engineering components, committed to delivering 100% defect-free products. However, recent customer complaints have highlighted discrepancies between product standards and received goods. The Quality Control Department (QC) at Plant 3 (GM 3) bears responsibility for ensuring product quality. Analysis revealed inefficiencies in the core QC processes of incoming inspection, labeling, and sorting, characterized by sample pile-ups and idle operators. These deviations from standardized procedures resulted in defective products reaching customers. In this study, a non-added value analysis was conducted on the quality control process using motion study and activity mapping. Non-added value activities were then eliminated by designing workstations and layouts with ABS method in the company’s warehouse. The elimination of waste can increase the effectiveness and efficiency of the company. With these improvements, the quality control work activities become more effective and efficient. In the proposed solution, it was found that 25% of motion waste and 10% of transportation waste were eliminated. This resulted in a 16% reduction in total work time. The total operational costs in GM 3 also decreased by 19%, or by 7 million rupiah per month. Thus, the elimination of waste improved work effectiveness and efficiency, which can impact the alignment with work standards. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT. Garuda Metalindo is a producer of fasteners and engineering components, committed to delivering 100% defect-free products. However, recent customer complaints have highlighted discrepancies between product standards and received goods. The Quality Control Department (QC) at Plant 3 (GM 3) bears responsibility for ensuring product quality. Analysis revealed inefficiencies in the core QC processes of incoming inspection, labeling, and sorting, characterized by sample pile-ups and idle operators. These deviations from standardized procedures resulted in defective products reaching customers. In this study, a non-added value analysis was conducted on the quality control process using motion study and activity mapping. Non-added value activities were then eliminated by designing workstations and layouts with ABS method in the company’s warehouse. The elimination of waste can increase the effectiveness and efficiency of the company. With these improvements, the quality control work activities become more effective and efficient. In the proposed solution, it was found that 25% of motion waste and 10% of transportation waste were eliminated. This resulted in a 16% reduction in total work time. The total operational costs in GM 3 also decreased by 19%, or by 7 million rupiah per month. Thus, the elimination of waste improved work effectiveness and efficiency, which can impact the alignment with work standards.
format Final Project
author Antonio, Steven
spellingShingle Antonio, Steven
PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
author_facet Antonio, Steven
author_sort Antonio, Steven
title PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
title_short PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
title_full PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
title_fullStr PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
title_full_unstemmed PERANCANGAN ULANG PROSES QUALITY CONTROL DI PT GARUDA METALINDO III DENGAN MENERAPKAN WASTE MANAGEMENT MATRIX DAN RELAYOUT METODE ABS
title_sort perancangan ulang proses quality control di pt garuda metalindo iii dengan menerapkan waste management matrix dan relayout metode abs
url https://digilib.itb.ac.id/gdl/view/83755
_version_ 1822998252638699520